918.280.9253
Steeltek

Steeltek

We were contracted in April of 2019 for a 10,000 sq ft slab on a commercial building project. Due to testing and recommendations, over a year long process, by city inspectors, engineers and geotechnical professionals work was temporarily halted. Once is resumed in...
McElroy Manufacturing

McElroy Manufacturing

This was a commercial paving for McElroy deliveries. 8″ thick for semi-trucks that regularly make deliveries. If you’ve paving needs or any concrete work and you want it done professionally? Check with JR&B to get it done the way it should...
Holsey Chapel Parking Lot

Holsey Chapel Parking Lot

In the middle of July 2019 JR&B completed this (approximately) 15,000 sq ft parking lot. This project was completed planned, designed, and managed by JR&B. It included a sidewalk around the entire building. The front of the building had a handicap accessible...
Crossland Heavy Contractors

Crossland Heavy Contractors

Projects under Crossland Heavy for City of Tulsa: Completed 21st St Bridge exit ramp to Riverside 41st and Memorial bridge/slopewall 31st Street paving, curb, and sidewalk from Lewis to YaleMorrow Road improvements – Sand Springs68th St and Yale street...
31st and Utica

31st and Utica

Working with a new contractor, Site Development Services, the 31st and Utica project was somewhat different. JR&B extended a parking area and built a culvert for water runoff and drainage. Contact JR&B for all your concrete needs.
11th and Elgin Parking Lot

11th and Elgin Parking Lot

In April the upper level lot was started. 5,000 square feet at the entrance off of Frankfort. By the end of May, beginning of June, the lower level huge lot was started at the entrance off of Elgin. 12,000 square feet lot was a large job. A 3am monolithic pour, a boom...